Building Sustainability

Driving resource efficiency to reduce our environmental footprint and protect human health.

0

1

Awards


BCA Award

Recognized for its sustainable design, eco-friendly construction practices, and innovative green technologies, The Heeren received the BCA Green Mark Platinum Award from the Building and Construction Authority in March 2011.

  • Platinum Award in 2021
  • Platinum Award in 2018
  • Platinum Award in 2015
  • Platinum Award in 2011

For information, BCA Green Mark Scheme was launched in 2005.

https://www1.bca.gov.sg/buildsg/sustainability/green-mark-certification-scheme

PUB Award

  • Water Efficient Building in 2010

0

1

Awards


BCA Award

Recognized for its sustainable design, eco-friendly construction practices, and innovative green technologies, The Heeren received the BCA Green Mark Platinum Award from the Building and Construction Authority in March 2011.

  • Platinum Award in 2021
  • Platinum Award in 2018
  • Platinum Award in 2015
  • Platinum Award in 2011

For information, BCA Green Mark Scheme was launched in 2005.

https://www1.bca.gov.sg/buildsg/sustainability/green-mark-certification-scheme

PUB Award

  • Water Efficient Building in 2010

0

2

Energy Efficiency


Chiller Initiatives
  • The building utilizes an energy-efficient, variable-speed chiller plant with a series counter-flow setup.
  • Built-in, permanent monitoring tools continuously verify heat balancing and chilled-water system efficiency.
LED Lightings
  • The building features upgraded LED lighting integrated with extensive motion sensors, automatically dimming the lights in empty spaces.

AIR HANDLING UNIT (AHU)

Energy Valves
  • Among the first to implement Energy Valves for tracking the dedicated cooling loads of individual AHUs.
Electronically-Commutated (EC) Fans
  • All Air Handling Units utilize Electronically-Commutated (EC) fans for superior energy efficiency.

0

3

Water Efficiency


NEWater
  • Cooling towers are supplied with NEWater as an eco-friendly alternative to domestic water.
Sprinkler System
  • Sprinkler system runoff is redirected to the fire tank to enable continuous reuse.

Monitoring Meters

  • Installed smart water meters to monitor consumption.

0

4

Green Environment


Green Wall
  • Reduce heat effect using Vertical Green Wall

Carbon Dioxide Sensor

  • Regulate demand for mechanical ventilation using Carbon Dioxide Sensor
Recycling
  • Recycling bin and storage area for recyclable waste.
Carpark System
  • Provision of carpark guidance system
Environment Policy
  • Provision of green guide and environment policy

0

5

Green Mobility


Bicycle Parking
  • Sheltered bicycle parking
Electric Vehicle Charging
  • Parking lot for electric vehicle charging
Easy Access
  • Covered walkway and easy access to bus stop and taxi-stand
Scroll to Top